As a leading global provider of intelligent transformer testing solutions, Qingdao Nanke International Electric Co., Ltd. has over a decade of R&D and industrial application experience in power equipment intelligent testing, dedicated to driving industry technological advancement. Nanke’s insulation resistance transformer testing equipment is part of its comprehensive transformer testing portfolio, designed for global transformer manufacturers, third-party testing labs, and power engineering companies. It solves core pain points including low testing efficiency, unreliable data recording, and inability to meet international precision standards. Adhering strictly to IEC 60076 and IEEE C57.12.90-2021 standards, Nanke’s equipment achieves breakthroughs in automated testing and traceable data management. By 2025, its solutions have served over 200 enterprise customers across multiple countries, applied in factory testing, lab verification, and on-site maintenance scenarios.

Technical Definition
Insulation resistance transformer testing equipment is a specialized instrument that measures transformer winding insulation integrity by applying DC voltage, preventing electrical failures through accurate insulation performance evaluation. Nanke’s equipment is developed based on automated data acquisition and intelligent control technologies, enabling precise, efficient, and traceable testing across diverse scenarios. As a critical component in transformer quality assurance, it is indispensable for ensuring safe power infrastructure operation.
Main Categories
To meet diverse industry needs, Nanke offers three core product series with insulation resistance testing capabilities: 1. Transformer Testing Instruments: Includes standalone insulation resistance testers, part of an 8-instrument portfolio covering all key transformer quality parameters, compatible with both standalone use and automated system integration.
2. Automated Distribution Transformer Testing Series (NKE-DTTS-AUTO): Supports one-time wiring for DC resistance and ratio testing, with data automatically uploaded to a centralized system, suitable for 5000kVA-30000kVA medium and large capacity transformers.
3. Modular Automated Power Transformer Testing System (PTTS-MD-AUTO): Integrated in 40-foot containers, featuring Class 0.01 metering-grade accuracy, designed for ultra-high voltage transformers up to 345kV/240MVA.
Design Philosophy
Nanke’s equipment follows core design principles of high reliability, precision, and automation, fully considering harsh industrial conditions. It adheres to full-life cycle reliability standards to deliver stable, low-maintenance, cost-effective solutions.
Technical Principles
The core working principle of Nanke’s insulation resistance testing equipment is based on DC voltage application and high-precision current measurement. The complete workflow includes: 1. Input: Apply specified DC voltage to transformer insulation components.
2. Processing: Measure leakage current via intelligent sensors and calculate insulation resistance using built-in algorithms.
3. Output: Automatically record data and generate standardized test reports.
Core Architecture & Innovative Design
Nanke’s equipment features a modular architecture with two key innovative modules: 1. Intelligent Data Acquisition Module: Equipped with Class 0.01 metering-grade sensors to ensure accurate data capture, with automatic error correction capabilities.
2. Centralized Data Management Module: Automatically uploads test data to a unified system, enabling real-time tracking, traceability, and report generation, eliminating manual recording errors.
Technical Parameters & Specification Standards
All parameters of Nanke’s equipment are tested strictly in accordance with IEC 60076 and IEEE C57.12.90-2021 standards, with clear test conditions and strict tolerance control. We provide full-parameter test reports for each batch and support third-party authoritative testing.
Parameter Category | Core Parameter | Standard Index | Test Conditions | Selection Reference |
|---|---|---|---|---|
Core Measurement Performance | Insulation Resistance Range | 0.1MΩ to 10TΩ | 25℃ room temperature, relative humidity ≤80% | Choose based on transformer insulation level requirements |
Accuracy Grade | ±5% | Standard testing environment | Ensures data meets international certification requirements | |
Electrical Characteristics | Test Voltage | 500V, 1000V, 2500V, 5000V | Stable power supply | Match with transformer rated voltage |
Environmental Adaptability | Operating Temperature | -10℃ to 50℃ | Continuous operation | Suitable for most industrial and outdoor scenarios |
Technical FAQs
Q: Does Nanke’s insulation resistance testing equipment support integration with automated production lines?
A: Yes, our equipment can be integrated into fully automated testing systems, supporting one-click testing and data synchronization with factory management systems.
Q: Can the equipment meet international certification requirements for transformer exports?
A: Absolutely, our equipment features Class 0.01 metering-grade accuracy, test reports are internationally recognized, and it complies with IEC and IEEE standards.
Q: What after-sales support does Nanke provide for overseas customers?
A: We offer 24/7 remote technical support, overseas spare parts warehouses, and multi-language manuals (English/Spanish/Arabic), with core components covered by a 3-year warranty.