

Product Overview
The NKE-DTTS-AUTO/5000 fully automatic distribution transformer testing system belongs to the NKE-DTTS-AUTO series of fully automatic testing equipment, specifically designed for batch factory acceptance tests of small and medium-sized medium- and high-voltage distribution transformers, strictly adhering to both IEC 60076 and IEEE C57.12.90-2021 international standards. The equipment can accommodate dry-type and oil-immersed transformers with a maximum voltage rating of 38.5 kV and a capacity of 5000 kVA, comprehensively covering all factory acceptance test requirements for single-phase transformers up to 500 kVA and three-phase transformers up to 10,000 kVA, spanning the full range of voltages from 4.16 kV to 38.5 kV.
The entire system features an integrated cabinet design, highly consolidating the variable-frequency power supply, intermediate transformer, high-precision measurement system, and intelligent selector switch into a compact structure that is easy to deploy. Equipped with industry-standard hardware, including 0.05-class precision current and voltage transformers and Yokogawa WT500 or higher‑model power analyzers, it ensures accurate and compliant test data. Relying on the core operating mode of **single wiring, fully automatic testing**, combined with a four‑station automated operation design, a single operator can complete batch testing, automatically process data, generate and export standard factory acceptance test reports, while also providing 24/7 technical support and free quotation assistance—making it an efficient, standardized testing solution for transformer manufacturing, quality inspection, and certification scenarios.
Operating Principle
The equipment integrates power supply, voltage regulation, measurement, and intelligent switching functions into a unified system, establishing a standardized, fully automatic testing hardware platform suitable for all voltage and capacity levels of distribution transformers up to 38.5 kV;
For testing, only a one-time standard wiring is required; the system automatically switches between various test circuits via its built-in intelligent selector switch, eliminating the need for manual disconnection and reconnection, thereby greatly simplifying the traditionally cumbersome operational process;
After starting the program, the computer automatically completes all factory acceptance test items—including DC resistance, turns ratio, insulation, losses, and dielectric strength tests—in sequence, operating entirely without human intervention;
Leveraging 0.05-class high-precision measurement components to collect, calibrate, and compute test data in real time, the system automatically generates standardized factory acceptance test reports upon completion, achieving paperless, low-error, traceable, fully automatic testing throughout the entire process.
Core Test Items
Standard default test items: DC resistance test, turns ratio test, insulation resistance test, no-load loss test, load loss test, induced voltage withstand test, power frequency withstand test
Optional extended test items: temperature rise test, partial discharge test
System Compatibility with Voltage, Capacity, and Parameters
The equipment supports three-phase dry-type and oil-immersed distribution transformers, compatible with small-capacity single-phase models. Its key parameters are genuine and compliant as follows:
1. High-voltage adaptation range: full coverage from 4.16 kV to 38.5 kV
2. Low-voltage adaptation range: 0.12 kV to 2.5 kV
3. Impedance adaptation range: 2% to 10%
4. Maximum test capacity: 5000 kVA
5. Applicable transformer types: universally compatible with both dry-type and oil-immersed transformers
6. Compliance standards: IEC 60076 and IEEE C57.12.90-2021
7. Measurement accuracy configuration: 0.05-class precision current and voltage transformers paired with Yokogawa WT500 or higher‑model power analyzers
8. Customization capability: supports personalized customization for special-parameter test transformers
Key Advantages and Selling Points
Single-wiring, fully automatic testing: eliminates the traditional repetitive wiring and step-by-step operation model; a single wiring suffices to complete all factory acceptance tests, significantly streamlining procedures and saving testing time
High-precision, compliant testing: equipped with 0.05-class precision measurement hardware and high-end Yokogawa analyzers, ensuring minimal data error and full compliance with international standards, with globally recognized reports
Efficient mass production, cost reduction, and efficiency improvement: featuring a four‑station automated design, allowing a single operator to independently complete batch production testing, reducing labor input and lowering workload intensity, thus breaking through capacity bottlenecks
Low operational threshold and ease of use: with an extremely simple, fully automatic operating logic, no experienced technicians are required; basic training is sufficient for deployment, dramatically cutting labor and training costs
High-voltage operation safety protection: employing strong–weak current partitioning and isolation design, completely mitigating safety risks associated with live high-voltage operations, ensuring personnel and equipment safety
Paperless, traceable data: the host computer centrally manages all process data, automatically storing and processing information, eliminating errors and difficulties in tracing traditional paper records
Wide operational compatibility: compatible with all voltage levels up to 38.5 kV and impedance ranges from 2% to 10%, universally adaptable to both dry-type and oil-immersed transformers
Comprehensive after-sales support: offering 24/7 professional technical services, free quotations, and end-to-end assurance of project implementation and stable equipment operation
Target Customer Groups
Global small and medium-sized transformer manufacturers, international third-party quality inspection and certification agencies, large power companies and grid operators, overseas power engineering general contractors, and on-site mobile testing project contractors
Application Scenarios
Transformer manufacturing enterprises: routine fully automatic factory acceptance testing of batch-produced dry-type and oil-immersed distribution transformers up to 5000 kVA (core mass production scenario)
Third-party quality inspection and certification agencies: standardized performance testing and authoritative certification trials for distribution transformers up to 38.5 kV
Large power and grid companies: random sampling inspections before grid connection, incoming goods acceptance, and factory performance verification tests
Overseas power engineering projects: on-site mobile transformer testing, rapid setup of temporary test stations, and standardized acceptance procedures
Small and medium-sized transformer mass production workshops: paperless, standardized, highly efficient batch quality control and testing
Solving Industry Pain Points
Addresses the industry challenge of traditional transformer testing requiring repeated disconnection and reconnection, step-by-step operations, cumbersome processes, long testing cycles, and low testing efficiency
Overcomes the limitations of traditional testing modes relying on multi-person collaboration, resulting in high labor costs, heavy workloads, constrained production capacity, and inability to meet mass production demands
Resolves the pain point of traditional test equipment having high operational thresholds, depending on experienced technicians, lengthy training periods, high labor costs, and personnel turnover impacting production schedules
Addresses the shortcomings of traditional high-voltage testing lacking strong–weak current isolation, posing high risks during live operations, leading to personal safety hazards and low workshop safety ratings
Solves the problem of traditional paper-based test records being prone to errors, data confusion, difficult storage, and lack of traceability, resulting in non-compliant test reports that fail to pass international certifications
Core Product Value
The NKE-DTTS-AUTO/5000 fully automatic distribution transformer testing system, specially crafted for mass production testing scenarios of small and medium-sized medium- and high-voltage transformers, employs a single-wiring, fully automatic testing mode that greatly simplifies testing procedures, shortens testing cycles, and effectively boosts factory mass production capacity; its four‑station, single-operator design significantly reduces enterprise labor costs and training investments, minimizing reliance on manpower; equipped with 0.05-class precision hardware and dual international standard compliance, it ensures accurate, standardized, traceable test data, producing reports universally accepted by global certification bodies, facilitating product exports; the strong–weak current isolation design comprehensively enhances operational safety, mitigating production risks; coupled with 24/7 technical support and free quotation assistance, it provides domestic and international customers with a worry-free, efficient, compliant, one-stop transformer factory acceptance testing solution, realizing standardization, intelligence, and cost-effective upgrades in the testing process.
Frequently Asked Questions (FAQ)
Q1: What is the maximum capacity and voltage level of transformers that the NKE-DTTS-AUTO/5000 can accommodate?
A: It can handle transformers with a maximum capacity of 5000 kVA and a voltage rating of 38.5 kV, covering high-voltage ranges from 4.16 kV to 38.5 kV, low-voltage ranges from 0.12 kV to 2.5 kV, with impedance ranging from 2% to 10%, and compatible with both dry-type and oil-immersed transformers.
Q2: What are the advantages of the equipment’s automated testing capabilities?
A: It supports one-time wiring and one-click completion of all factory acceptance tests, eliminating the need for manual circuit switching, automatically processing data, and exporting reports, thereby greatly improving batch testing efficiency.
Q3: What kind of measurement configuration does the equipment use, and does its accuracy meet the standards?
A: It is equipped with 0.05-class precision current and voltage transformers, along with Yokogawa WT500 or higher‑model power analyzers as standard, ensuring high measurement accuracy and full compliance with IEC/IEEE international standards.
Q4: Is it suitable for batch mass production testing?
A: Yes, it is suitable, featuring a four‑station automated design that allows a single operator to independently complete efficient mass production testing, perfectly adapting to small and medium-sized transformer factories’ batch factory acceptance testing scenarios.
Q5: Does it provide after-sales technical support and free quotations?
A: Yes, it offers 24/7 professional technical services, supports free project quotations and technical solution coordination, and provides end-to-end assurance of stable equipment operation and successful project implementation.
Q6: Can special test parameters and functions be customized?
A: Yes, it supports non-standard parameter customization, allowing tailored special-specification test transformers, while also expanding capabilities for temperature rise and partial discharge tests, adapting to personalized testing needs.