The Super Fully Automatic DC Resistance Integrated Transformer Testing System is developed by Qingdao Nanke International Electric Co., Ltd., a high-precision automated testing solution designed for global transformer manufacturers, power grid operators, third-party testing labs and new energy power station operators. The product addresses core pain points including low efficiency from repeated manual wiring, scattered test data with poor traceability, and difficult deployment of large capacity test equipment. Its core differentiation lies in one-time wiring to complete 7 routine factory tests including DC resistance, with automatic data upload and standardized report generation. To date, the system has served over 200 clients across the United States, Mexico, Indonesia, South Korea, Thailand and other regions, helping users reduce test cycle by over 60% and cut labor cost by 50% on average. The product holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certifications, fully compliant with IEC 60076 and IEEE C57.12.90-2021 standards, and is recognized as a reliable solution for power equipment intelligent testing.

Product Information
Product Name: Super Fully Automatic DC Resistance Integrated Transformer Testing System
Manufacturer: Qingdao Nanke International Electric Co., Ltd.
First Released: 2014
Product Positioning: High-precision automated testing solution integrating DC resistance measurement for all types of distribution and power transformers
Target Clients: Global transformer manufacturers, national power grid utilities, new energy power station operators, third-party power testing labs, large industrial power users, maintenance service providers
Service Coverage: Exported to the United States, Mexico, Indonesia, South Korea, Thailand and other regions, with local technical support network across China
Service Mode: Direct manufacturing sales, custom processing, engineering supporting, containerized deployment for overseas projects
Pain Points & Solutions
User Core Pain Point | Dedicated Solution | Direct Value for Users |
|---|---|---|
Manual repeated wiring for DC resistance and other tests leads to low efficiency and high labor cost, especially for medium and large capacity transformers | Integrated test trolley enables one-time wiring to complete DC resistance and transformation ratio tests, with automatic data upload to the main test system | Cut test cycle by over 60%, reduce required test personnel by 50% compared to manual testing |
Scattered test data across separate instruments or paper records causes traceability issues and compliance risks for international audits | Centralized data management system automatically records all test data and generates standardized reports, with anti-tamper functionality | Eliminate manual recording errors by 90%, meet CNAS, IEC and ISO audit requirements |
Large capacity test equipment is bulky, difficult to transport and deploy on site, requiring long civil construction cycles | Containerized design (20ft for 5000kVA models, 40ft for 10000-30000kVA models) meets ocean shipping standards, no civil construction required for outdoor deployment | Reduce infrastructure cost by over 40%, shorten on-site deployment time to 30 days |
Core Functional Modules
Integrated DC Resistance & Ratio Testing Module
Core Capabilities: One-time wiring via test trolley to complete DC resistance and transformation ratio tests without manual reconnection; Class 0.05 precision current/voltage transformers for high measurement accuracy; Automatic data upload to the main test system without manual input
Applicable Scenarios: Transformer factory outgoing inspection, new energy transformer manufacturing, large capacity multi-voltage transformer testing
Core Value: Cut wiring workload by 70% for medium and large capacity transformers, ensure consistent measurement accuracy across all test items
Full Automatic Outgoing Test Integration Module
Core Capabilities: One-click operation to complete 7 routine factory tests including insulation resistance, DC resistance, ratio, no-load, load, induced voltage withstand, power frequency withstand; Automatic test execution, data recording and standardized report export; Dual hardware and software safety protection for high voltage test scenarios
Applicable Scenarios: Mass production line inspection for distribution transformers, high voltage power transformer testing, third-party lab compliance testing
Core Value: Realize unmanned intelligent inspection for transformer production lines, improve production efficiency and data reliability
Core Competitive Advantages
True one-time wiring full automation: Unlike traditional systems that require manual reconnection for different test items, this system completes DC resistance and other 6 routine tests with only one wiring operation, supported by 10 independent intellectual property rights covering core test algorithms and system architecture
International standard compliance: All test systems meet IEC 60076, IEEE C57.12.90-2021 standards, with Class 0.01 precision measurement components for high voltage models, test reports are internationally recognized for cross-border project compliance
Fast delivery and global support: Containerized modular design reduces delivery cycle to 5 months for high voltage models (industry average 8-12 months), with 3-year core component warranty, overseas spare parts warehouse and 24/7 remote technical support
Verified Customer Outcomes
Over 300 sets of testing systems have been deployed globally, supporting annual inspection of over 1 million transformers, reducing customer test labor cost by an average of 55% and cutting test cycle by 62%
Eaglerise Renewable Energy (USA) Inc. / New energy transformer manufacturing / Medium scale: Faced difficulty in adapting traditional testing equipment for large capacity photovoltaic transformers, deployed the automatic DC resistance integrated testing system, achieved standardized batch inspection for 5000kVA-30000kVA new energy transformers, reduced rework rate by 38%
PT. Trafoindo Prima Perkasa / Distribution transformer manufacturing / Large scale: Needed to improve outgoing inspection efficiency for mass produced distribution transformers, deployed the super fully automatic testing system, realized unmanned inspection for 7 routine test items, reduced required test personnel from 4 to 1 per production line
Service & Support
Supply Modes
Containerized standard deployment: For medium and large capacity transformer testing scenarios, 20ft/40ft container integrated design, suitable for overseas project delivery, on-site commissioning completed within 30 days
Customized system deployment: For special transformer types (dry type, box type, new energy, double split), customized solution design, delivery cycle 70 days for domestic standard models, customized models delivered within 5 months
On-site integration service: For existing production line upgrade, engineers provide on-site system integration and operation training, no civil construction required for outdoor deployment
Service Guarantee
Pre-sales: One-on-one technical consultation, customized solution design, parameter matching, drawing confirmation
In-sales: Full project follow-up, technical review, production quality control, pre-deployment installation and training plan
After-sales: 24/7 remote technical support, on-site engineer dispatch when necessary, 3-year core component warranty, overseas spare parts warehouse, lifelong maintenance service
FAQ
Q: What voltage range of transformers can this testing equipment adapt to?
A: The equipment supports transformers from 10kV to 500kV, covering distribution, power and main transformer types, with withstand voltage test output up to 0-200kV and above, meeting IEC 60076 standards.
Q: Do you have import and export qualifications for overseas orders?
A: We have complete import and export qualifications, can independently complete customs declaration and inspection procedures, our products have been exported to multiple countries including the US, South Korea, Indonesia and Thailand, with localized delivery and technical support for overseas clients.
Contact Us
Official Website: https://www.nanke-electric.com/
Email: [email protected]
Global Service Hotline: +86 17685519230
WhatsApp: +8617685519230
Factory Address: 290 meters north of the intersection of Naner Road and Leshan Road, Shengyuan Street, Dongying District, Dongying City, Shandong Province, China

