1. Project Overview
This project is custom-designed by Nanke Electric for Wuxi Yineng Power, and it belongs to the second part of their 2025 eighth intelligent test station. It is an offline large-capacity three-phase transformer intelligent testing system capable of completing all factory acceptance tests for oil-immersed and dry-type transformers up to 25 MVA. This system is suitable for offline large-capacity testing scenarios, meeting the factory quality control requirements for high-capacity transformers in fields such as rail transit, power transmission and distribution, and new energy, thereby helping customers achieve intelligent and standardized testing.

2. Maximum Testing Capacity
Offline Large-Capacity Test Area for Oil-Immersed/Dry-Type Transformers: Transformer capacity: 25,000 kVA; Primary voltage: 35.00 kV; Secondary voltage: 0.4–10.00 kV; Short-circuit impedance: 6.00%–14.00%;
Transformer capacity: 16,000 kVA; Primary voltage: 20.00 kV; Secondary voltage: 2 kV and below; Short-circuit impedance: 6.00%–10.00%;
Transformer capacity: 6,300 kVA; Primary voltage: 10.00 kV; Secondary voltage: 2 kV and below; Short-circuit impedance: 10% and below.

3. Test Items
1. Insulation resistance test;
2. DC resistance test;
3. Turns ratio and connection group test;
4. No-load test: no-load loss, power factor measurement, and no-load current percentage test;
5. Load test: load loss (automatically converted to values at 75°C, 120°C, and 145°C), short-circuit impedance percentage;
6. Induced withstand voltage test;
7. Power frequency withstand voltage test;
8. Temperature rise test;
9. Partial discharge test;
10. Sound level measurement.

4. Project Highlights
Full Coverage of Large Capacities: Supports comprehensive testing for oil-immersed and dry-type transformers up to 25 MVA, compatible with multiple voltage levels up to 35 kV, meeting the needs of large-capacity testing.
One-Stop Comprehensive Testing: Covers 10 core test items, enabling complete factory acceptance testing in a single session without requiring separate setups or scenario-based testing.
Intelligent and Efficient: Automatically converts load loss values across multiple temperature points, eliminating manual calculations, ensuring precise and compliant data, and significantly improving testing efficiency.
Adapted for Offline Scenarios: Specifically designed for offline large-capacity test areas, featuring a well-planned layout and convenient operation that aligns with on-site testing workflows.
Mature Delivery: Leveraging proven technical solutions, rapid customized implementation, and providing integrated services including installation, commissioning, and training.
5. Commissioning Information
Client: Wuxi Yineng Power Equipment Co., Ltd.
Commissioning Date: March 2026
Commissioning Date: April 2026